No address? No problem.
Gift details
Experience precision pleasure with 7 inches of hand-crafted borosilicate glass, expertly curved to target your G-spot with anatomical accuracy. The generous bulbous tip delivers satisfying fullness while the ergonomic curve guides each stroke exactly where you need it.
Why You'll Love It:
- Targeted G-Spot Stimulation - Gentle curve and broad surface area provide the coverage and pressure your G-spot craves
- Luxurious Weight & Glide - Substantial glass construction offers effortless movement and heightened sensation
- Temperature Play Ready - Warm or cool for customized sensory exploration
- Dual-Ended Design - Textured grip bulb ensures confident control during solo or partnered play
- Versatile Pleasure - Perfect for G-spot or P-spot stimulation, vaginal or anal use
Premium Glass Construction: Non-porous, hypoallergenic borosilicate glass is body-safe, easy to clean, and compatible with all lubricant types. The smooth, seamless surface glides effortlessly and retains temperature beautifully.
Care: Wash with warm water and mild soap or toy cleaner. Dishwasher safe (top rack). Store in included protective pouch.
Full Features & Specs
Dimensions
Materials
Lube Compatibility
Safe for all lubes
Weight
Water Resistance
Waterproof
Made In
China
In The Box
Dildo, Storage Bag
Warranty
3 Years